Construction Pictorial

Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

First, we unpack the box.

To install it, we need to remove the water pump and timing cover.

With the pump removed, we put a new gasket on and install the studs that will hold the new timing cover.

Here's the new timing cover installed.

Next we install the A/C compressor.

And finish it up by installing the alternator and the pulleys.

Now we'll bolt up the Finish Line Transmissions C-6 and get ready to drop it between the frame rails.

Now we set it in and get it lined up.

Next we'll get the placement right and weld in the motor mounts.

Now we know we'll have to make a slight modification to the tunnel. Michael makes the cut to trim for the transmission.