Construction
  Completed Cars
  The Gang
  Tech Stuff
  Services
  Rods For Sale
  Build A Rod
  Package Deals
  Show Dates
  Customer Cars
  Links
  Hot Rod Art
  Location
  Contact Us
  About Us
  Feedback
  Shipping Info
    Privacy Policy
    Return Policy
  Home
 

 

 

 

 

 

 

 

 

 

   
 

Order Line

 

888-680-1932

   
 

Tech Line

 

931-680-0010

   
   

Dave Hurd's '32 Ford Three Window


Construction Pictorial

Page 1 2 3 4 Next-->


Dave Hurd's Good Start '32 Three Window is now under construction. The frame rails are in the jig ready to be boxed.

The side jig's hold the frame rails in position during boxing to maintain their shape and keep them in the right position on the jig.

Here you can see the boxing plates tacked in place.

Here's a closer look showing the fit and the tack welds spaced out.

Once the boxing plates are completely tacked, we weld them up by stitch welding them.

Here's the finished boxing plates welded in. The next step is to grind them smooth.

The '32 three window body was placed on the frame to make sure that everything was lining up correctly and then removed again.

The front and rear crossmembers are welded in and the tubular center crossmember is tacked in place. The front notch has also been started.

The rear of the frame has been c-notched for axle clearance.

The center crossmember is welded in.

Page 1 2 3 4 Next-->

©1997 -  2007 Street Rods by Michael

New Visions Internet

Used Parts Central