T-Shirts!
   
  Construction
  Completed Cars
  The Gang
  Tech Stuff
  Services
  Rods For Sale
  Photo Gallery
  Build A Rod
  Package Deals
  Build Sheets
  Show Dates
  Customer Cars
  Links
  Hot Rod Art
  Location
  Catalog Index
  Contact Us
  About Us
  Feedback
  Shipping Info
  Home

   

   
 

Order Line

 

888-680-1932

   
 

Tech Line

 

931-680-0010

   
   

Dave Hurd's '32 Ford Three Window


Construction Pictorial

Page 1 2 3 4 Next-->


The goodies are laid out on the table and soon to be installed on the perimeter chassis.

The front suspension is being installed. Dave opted for the completely chromed front end along with the Super Deluxe Brake package.

Here's a better look at the polished front brake kit.

Johnathan has the 9" Ford rear in place and is installing the upper bars of the 4-bar. The digital angle finder is used to get the brackets at exactly the right angle.

Here's the Billet VinTech wheels mounted up on BF Goodrich radials. These will make a perfect "big and little" look!

The body has been re-installed on the frame so the clutch and brake pedal can be installed.

Johnathan will install the clutch/brake pedal bracket and find the correct location to put the hole in the firewall for the pedals to go through.

The clutch/brake bracket is tacked in place and Johnathan is determining where the holes will have to be cut for the pedals.

The holes have been cut in the firewall for the pedals.

Our plastic engine is being used to set up the motor mounts.

Page 1 2 3 4 Next-->

©1997 -  2007 Street Rods by Michael

New Visions Internet

Used Parts Central