|
|
| The
front suspension is being installed. Dave opted for the
completely chromed front end along with the Super Deluxe
Brake package. |
|
|
|
| Here's
a better look at the polished front brake kit. |
|
|
|
| Johnathan
has the 9" Ford rear in place and is installing the
upper bars of the 4-bar. The digital angle finder is used
to get the brackets at exactly the right angle. |
|
|
|
| Here's
the Billet VinTech wheels mounted up on BF Goodrich
radials. These will make a perfect "big and
little" look! |
|
|
|
| The
body has been re-installed on the frame so the clutch and
brake pedal can be installed. |
|
|
|
| Johnathan
will install the clutch/brake pedal bracket and find the
correct location to put the hole in the firewall for the
pedals to go through. |
|
|
|
| The
clutch/brake bracket is tacked in place and Johnathan is
determining where the holes will have to be cut for the
pedals. |
|
|
|
| The
holes have been cut in the firewall for the pedals. |
|
|
|
| Our
plastic engine is being used to set up the motor mounts. |
|
|
|
Page 1
2
3 4
Next-->
|
|
|