T-Shirts!
   
  Construction
  Completed Cars
  The Gang
  Tech Stuff
  Services
  Rods For Sale
  Photo Gallery
  Build A Rod
  Package Deals
  Build Sheets
  Show Dates
  Customer Cars
  Links
  Hot Rod Art
  Location
  Catalog Index
  Contact Us
  About Us
  Feedback
  Shipping Info
  Home

   

   
 

Order Line

 

888-680-1932

   
 

Tech Line

 

931-680-0010

   
   

Tom Johnson's '41 Willys


Construction Pictorial

Page: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

Another view of the steering box with the bracket.  

On most of most of our Willys chassis we beef the chassis up pretty good because Willy owners like horsepower.

We have tach welded all of the tubes in place, for welding in later.

We have bent the upper tube of the crossmember to also hold the master cylinder and the clutch master cylinder.

Again everything is still tach welded before welding.

Now everything has been set in place we have taken the chassis apart to start the finish welding on top.

Here we have taken the chassis out of the jig to finish welding everything underneath.

And more welding.

With the bracket hanging down so far, we had to gusset the steering bracket for strength.

Jaysun has put the front shock mounts on the side of the chassis and on top of the tube axle.

Page: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

Next --->

©1997 -  2007 Street Rods by Michael

New Visions Internet

Used Parts Central