|
|
| Front
view of the same assembly |
|
|
|
| Here's
the Big Al's engine, getting ready to be installed into
the chassis. |
|
|
|
| Well
we made it, it is hanging in place. |
|
|
|
| We
are making sure the pedal assembly will clear the engine. |
|
|
|
| The
pedals fit in great, but what are we going to do about the
gas pedal? We put a notch in the tunnel to see how it
would work. |
|
|
|
| We
did not like the way the pedal fit, we noticed that with a
5 speed there was alot of room for the floor to be
flattened. |
|
|
|
| Because
the upper part of the tunnel could be flattened this will
allow us to have plenty of room for the pedal. |
|
|
|
| We
changed the back half of the tunnel to match the front. |
|
|
|
| Here
the tunnel is roughed in. |
|
|
|
|
|
|
|
|
|
Next
--->
|
|
|