|
| The
frame has been moved to the assembly shop and
put on the rack. |
|
|
|
| This
picture gives a better view of the front and the
actual color of the frame. |
|
|
|
| John
has begun the installation of the stainless
brake lines. They're routed along the front
crossmember and connect to thru the frame
fittings. |
|
|
|
| Here's
the line on the back run along the shock
crossmember. |
|
|
|
| Michael
assembles one of the coilovers. |
|
|
|
| The
front a-arms are hung on the frame. |
|
|
|
| Here's
the master cylinder and brake lines installed. |
|
|
|
| The
crate engine is being readied for some chrome
goodies. |
|
|
|
| Charles
is installing the chrome intake. |
|
|
|
| The
wheels and tires are on and the chassis is
rolling. |
|
|