T-Shirts!
   
  Construction
  Completed Cars
  The Gang
  Tech Stuff
  Services
  Rods For Sale
  Photo Gallery
  Build A Rod
  Package Deals
  Build Sheets
  Show Dates
  Customer Cars
  Links
  Hot Rod Art
  Location
  Catalog Index
  Contact Us
  About Us
  Feedback
  Shipping Info
  Home

   

   
 

Order Line

 

888-680-1932

   
 

Tech Line

 

931-680-0010

   
   

Jeff Mayner's '33 Ford Viper

Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15


Construction Pictorial Page 11

 
Now the chassis is waiting for the engine to be completed.

The chrome intake and polished valve covers are on the engine and the brackets and accessories are going together.

The engine is dressed out and ready to be set in the chassis.

The transmission is mated to the engine and the chassis is rolled underneath.

Richard finishes bolting in the driveline.

This is a great time to bleed the brakes and the clutch cylinder.

The exhaust is hung on the chassis.

Larry is installing the driveshaft and we're almost ready to set the body on.

The chassis is rolled onto the rack and the body is slowly lowered onto the frame.

Body on and ready to bolt it down.

Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Next-->

©1997 -  2007 Street Rods by Michael

New Visions Internet

Used Parts Central