| The
chassis is on the ground with the wheels and tires mounted
up. |
|
|
|
| Here's
a better look at the front Billet Specialties Altered
wheels. |
|
|
|
| Next
step is to run the brake lines. The "through the
frame" fittings are installed up front. |
|
|
|
| The
residual valves are on and the tubing is being run. |
|
|
|
| That's
a whole lotta Hoosier on the back! |
|
|
|
| The
brake lines are run and the body is set on the chassis. |
|
|
|
| The
transmission has arrived from Finish Line Transmissions.
It's been beefed up to handle the power of the Steve
Schmidt Racing Engine. |
|
|
|
| We
bolted the engine and transmission together and dropped
them into the frame rails to get an idea of where they
need to be. Looks like some cutting is going to have to be
done on the floorboard. |
|
|
|
| John
starts whacking on the body. |
|
|