I have finally got some updated
pictures of my progress.
I now have the drive train
completed.
The Borla 2.5" Exhaust system has
been installed.
I've got the brake lines are run,
but still have to finish up many of the fittings and such
up to the master cylinder.
(But that's on hold while I'm
waiting for my new flare tool to arrive. The old one she
is kaput!)
So in the mean time, as the pictures
show was refitting the body to cut out
the hole for the shifter, which
I finished last night. BTW with the TKO 500 and Aluminum
Corvette Bellhousing, I only had to make one
3" round hole
to get the tranny to fit with
the body back on.
The seats from Tea's have arrived
but are only just sitting on the floor at this point.
Also I have the instruments
installed, and next up is to finish up the steering column
installation.
I'll send some more pictures
as I get other big items completed.
Cheers,
Dave...