HotRod and Muscle Car Parts
Call us Toll Free
1.888.680.1932
Tech Line
(931).680.0010
HOME VIEW CART CHECKOUT
MY ACCOUNT HELP SIGN IN

Return to Page 1                                                                                                             Go to Page 3

70-14

 

 

 

Jaysun is using an air chisel to remove the leftover metal on the inner rocker.

70-16

 

 

 

Most of the sheet metal has been removed.

70-17

 

 

 

Here's a picture of the torque tube and tranny brace.

70-18

 

 

 

Here's the floor before we started preparing it for the install.

70-19

 

 

 

We punched holes in the floor to be re-spot welded.

70-20

 

 

 

 The paint was ground off of the floor board so it wouldn't contaminate the weld.

70-21

 

 

 

We re-sprayed the edges with weld-through primer where the paint was ground off so there wouldn't be a rust build up.

70-22

 

 

 

Floor is installed.

To see the HEIDT'S PRO-G Front Suspension Installation on Slingblade go to  Page 3